MATERIAL FOR LAKE-COUNTRY PROPERTIES.
Storlie's regional pit lineup for Big Winnie country starts with Class 5 gravel, the first call for a resort or cabin road base before any finer material goes down. Gravel is a common order for cabin roads, parking areas, and other aggregate surfaces. Around Big Winnie, sewer rock is the steady order for resorts and cabins keeping their own septic systems in shape, and pit run sand raises or levels ground wherever the job calls for bulk fill instead of a finished product. Enough cabins on Big Winnie ask about washed sand for the beach that it is worth mentioning up front. Rip rap can be supplied where a property owner, contractor, or project plan calls for larger stone near a bank or shoreline.
Storlie does not represent rip-rap installation or permitting as a standard service. The installing contractor and property owner should confirm sizing, placement, design, and any required approvals before ordering.