MATERIAL FOR CABIN-COUNTRY PROJECTS.
Access roads and driveways around Pennington typically start with Class 5 gravel from Storlie's regional pit network, alongside sewer rock, screened sand, and pit run sand. Cabins and resorts around Pike Bay run their own septic systems, which keeps sewer rock moving for drainfield work. For bedding or backfill on a cabin building site, screened sand is the practical middle option, and pit run sand covers bulk fill work before the finish material goes down. Washed sand can also be brought in for an owner who wants a cleaner topping near a dock or waterfront sitting area, though it is ordered less often out this way than the other three.
Rip rap is available as a supplied material for shoreline and erosion-control applications. Storlie does not represent the installation, engineering, or permit process; those responsibilities stay with the property owner and the appropriate contractor or agency.